Connect with us:
Assignment View

Analysis of the Anglo French Concorde project to design and build a supersonic airliner

Number of Words : 5207

Number of References : 15

Contents

  Introduction
  Project Background
  Stakeholder analysis
  Project issues
  Cultural barriers
  Language barriers
  Difference in Corporate Cultures
  Technological Differences
  Recession of the 1970s
  Other issues
  Conclusion
  References

Description

When the last flight of the iconic Anglo Frech Concorde flew in 2003, it signaled the end of the most adventurous and colorful era in the Civil Aviation history. The Aerospatiale-BAC Concorde aircraft was a turbojet-powered supersonic passenger airliner, a supersonic transport (SST). It was a product of an Anglo-French government treaty, combining the manufacturing efforts of Aérospatiale and the British Aircraft Corporation (Kenneth Owen, 2001). First flown in 1969, Concorde entered service in 1976 and continued for 27 years. The Concorde SST project was a joint collaboration between the UK and the French governments. The project was executed by a consortium with members such as the British Aircraft Corp. and Aerospatiale. These were the companies that had designed the conceptualized the aircraft. But the respective governments had to intervene since they ran short of funds to execute the project. Although, Concorde SST was the most successful and colorful chapter of Aviation, which ended in 2003, the project days were not satisfactory as far as the performance of the project consortium was concerned. The project was marred by delays and spiraling costs. The budget escalated many times the initial estimate. The project duration was extended to fourteen year from the initially planned four years. Although, there were a couple of external influences that caused the delay or spiraling budget, most of the reasons to the delay and increased costs could be attributed to inefficient management practices. The paper analyses as to what went wrong the caused enormous delay and huge increase in costs and finds out reasons that caused them. The paper also does a stakeholder analysis to find out the extent of influence of each of the stakeholder involved in the project. The paper makes recommendations as to how the problems could have been fixed and the delays and spiraling budget could have been avoided. <br />

Price Details

Price Full Assignment : 180 USD    (Ready assignment, instant delivery)

Price Custom Assignment : 360 USD    (Assignment Uniquely made for you with Plagiarism Report, Delivery within 72 hours)

Price References : 20 USD (Only References, Instant Delivery)

AKey : MHGCA-388

How It Works:-

www.ry-diplomer.com

misterroof.net/roofing-and-siding-contractor-canton

барные аксессуары